Conock: Wiltshire – England

Now this really is a beautiful pool. And a large one at that. This required contracting a pre-fabricated concrete panel company. We had the panels delivered in pieces and locked them into the patented fixings in the pool base. A crane was on site for two days, and the team a further 2 weeks. By which time we were ready to fully skim and tile the pool, under a temporary shelter, which was kept warm via a gas heater. The finish speaks for itself.